MIYOQA / Blog

Case studies from the shop floor of quality.

How MIYOQA works through real quality engineering problems, shown on live product screens. Every case uses demonstration data that ships with the product.

From leak rejects to a root cause, in eleven steps

A pump housing drifted out of flat and leak rejects rose. MIYOQA worked the problem from the records, and left every decision to the engineer.

Read the case

When a Ppk of 2.03 is not good enough

The index was well above the requirement, and MIYOQA still blocked the release. A capability number is only as good as the process behind it.

Read the case

Ask the plant a question, and check every line of the answer

One question became a plan of three engine steps and a brief in which every sentence points to its source.

Read the case

Which station limits the line? A capacity check you can verify

Five stations, one bottleneck, and a throughput figure checked a second way before anyone relies on it.

Read the case

Find the first PPAP rejection before your customer does

Eighteen elements, each with its evidence, and a rehearsal that stops exactly where a reviewer would.

Read the case

A new station screen, drafted and checked before release

A rule on the nonconformance screen was too weak. Here is how the change was drafted, checked against its scenarios, and held for two approvals.

Read the case

The person who wrote the change cannot approve it

Separation of duties on a bill of process, enforced by the software rather than by a procedure on the wall.

Read the case